Septic permits in the CSRA, explained

Two states, two completely different processes, and a lot of out-of-date information online. Here's how it actually works, and what we handle for you.

The one-line difference

South Carolina permits septic systems at state level through SCDES: a $150 site evaluation, a permit valid five years, and Tier 3 installers may self-inspect their own work. Georgia permits at county level through the County Board of Health: a 20-day decision window, a permit valid 12 months, and a mandatory county inspection before backfill, every time.

Why this page exists

Septic permitting is the single biggest source of delay and surprise cost on a new build, and it's the part most homeowners and even some builders don't plan for. It's also an area where a lot of the information online is simply wrong, because South Carolina reorganised its agencies in 2024 and much of the published guidance hasn't caught up.

We handle permits as part of the job. You don't have to read any of this. But if you want to understand what's happening and why it takes the time it does, this is the honest version.

The two systems side by side

 South CarolinaGeorgia
Who issues the permitSCDES, at state levelCounty Board of Health
Governing ruleRegulation 61-56Rule 511-3-1
Site evaluation fee$150, set by regulationVaries by county, confirm locally
Decision timeframeDriven by evaluation scheduling20 days from complete application
Permit validity5 years12 months
Final inspectionTier 3 may self-inspectCounty, mandatory, before backfill
Min tank, up to 4 bedrooms1,000 gallons1,000 gallons
Each extra bedroom+250 gallons+250 gallons
Garbage grinderNo specific provision+50% capacity
Two-compartment tankNot specifiedRequired

Read that permit validity row again if you're a builder. Five years versus twelve months completely changes how you phase lots across the two states.

Which one applies to you

  • South Carolina: Aiken County, Edgefield County, Barnwell County. Covers North Augusta, Aiken, Beech Island, Clearwater, Graniteville, Belvedere, Edgefield and the rest. Full SC permit guide →
  • Georgia: Richmond, Columbia, McDuffie and Burke counties, all under the East Central Health District. Covers Augusta, Evans, Martinez, Grovetown, Hephzibah, Harlem and Thomson. Full GA permit guide →

Building on both sides, or comparing? Read the full comparison →

What we handle

  1. 1

    Application preparation

    The forms, the plat or deed with lot dimensions, the property owner permission letter, the site sketch showing boundaries, building corners, well locations and the proposed drain field area.

  2. 2

    Submission and follow-up

    Through the SCDES ePermitting portal in South Carolina, or to the county health department in Georgia. Then we chase it, so you don't have to.

  3. 3

    Site preparation for the evaluation

    Clearing vegetation for evaluator access, staking the building footprint, placing site cards at the property entrance and preferred system location. Small things, but a wasted evaluator visit costs you a week.

  4. 4

    Coordinating the professionals

    Where the job needs a licensed Professional Soil Classifier or a registered professional engineer, we coordinate them rather than handing you a list of phone numbers.

  5. 5

    Final inspection

    In South Carolina we notify the local SCDES office ahead of final inspection, and as a Tier 3 installer we may self-inspect our own installations. In Georgia we schedule the county inspection and do not backfill until written approval is issued.

The most common mistake: starting work before the permit. In Georgia, no one may begin the physical development of a lot where an on-site sewage system will be used without first obtaining a construction permit. Not before the system goes in. Before the lot is developed. People clear and grade first and find out afterwards.
Straight answers

Common questions

Who issues septic permits in South Carolina?
SCDES, the South Carolina Department of Environmental Services, at state level through their ePermitting portal. Not the county. Note that SCDHEC was split in July 2024 and environmental functions moved to SCDES, so older guidance naming DHEC is out of date.
Who issues septic permits in Georgia?
The County Board of Health. Georgia onsite sewage is governed by state rule under the Department of Public Health, but permits are issued at county level. Richmond, Columbia, McDuffie and Burke counties all fall under the East Central Health District.
How much is a septic permit in South Carolina?
The site evaluation fee set by regulation is $150. Be cautious of national cost websites that list septic permits at $450 to $2,300; those figures are national averages and are not accurate for South Carolina.
How long does the permit process take?
In Georgia the County Board of Health must approve or disapprove within 20 days of receiving completed paperwork. In South Carolina the timeline is driven mainly by how quickly the site evaluation is scheduled, which can be accelerated by hiring a private licensed Professional Soil Classifier.
Can you handle the permit for me?
Yes, and we do it as part of the job. Application preparation, submission, follow-up, site preparation for the evaluation, coordinating any required soil classifier or engineer, and the final inspection.
What's different between a South Carolina and a Georgia septic permit?
South Carolina permits at state level through SCDES, valid five years, and Tier 3 installers may self-inspect. Georgia permits at county level, valid twelve months, with a 20-day decision window and a mandatory county inspection before backfill. Georgia also requires two-compartment tanks and adds 50 percent capacity for a garbage grinder.
Do I need a permit to repair an existing system?
Yes in both states. In South Carolina you must notify SCDES before relocating or replacing a system or its components and they determine whether a new permit is required. In Georgia, all repairs, replacements and additions to existing systems require permitting and inspection.
Get started

Get a real estimate, not a guess

Tell us about the property and what it's doing. We'll come look, tell you straight what it needs, and give you a number you can plan around.

  • 📞
    Call or text
    (803) 2-PUMP-IT803-278-6748
  • 🕐
    Office hours
    Mon-Fri, 8am-5pmEmergency service available outside these hours
  • 📍
    Based in
    North Augusta, SCServing the CSRA, both sides of the river

Request an estimate

Most requests get a call back the same business day.

📞 Call Now💬 Text Us