New construction · Subdivisions · Phased lots

Septic that doesn't hold up your build

The septic permit gates your building permit and your certificate of occupancy. We treat it that way, and we bring it into the schedule at design rather than at framing.

Why builders call us

Two things matter to a builder on septic: does it pass, and does it hold up the schedule. As a Tier 3 installer in South Carolina we may self-inspect our own installations, which removes an inspector from your critical path entirely. In Georgia we schedule the mandatory county inspection and plan around it rather than discovering it. And on tight lots we can install engineered systems most contractors legally cannot.

What we handle for you

  • Permits, start to finish. Application, submission, follow-up, site preparation for the evaluation, and coordination of any required soil classifier or engineer. You get updates, not homework.
  • Phased scheduling across lots. One point of contact, one schedule, and honest lead times rather than optimistic ones.
  • Engineered systems where lots are tight. Clay soils and smaller subdivision lots are the standard squeeze in Columbia and Aiken counties. An engineered design can achieve the same treatment in less ground, which sometimes recovers a lot you'd otherwise write off.
  • Both states. If your projects cross the river, you don't need two septic subs.
  • Volume pricing on multi-lot work.

The two things that cause septic delays on builds

  1. 1

    Starting the permit too late

    Georgia rule is explicit: no person may begin the physical development of a lot where an on-site sewage system will be used without first obtaining a construction permit. Not before the system goes in. Before the lot is developed. We see people clear and grade first and find out afterwards. In South Carolina the sequence is friendlier, but the site evaluation is still the long pole and it can't be compressed once you're behind.

  2. 2

    Discovering the lot won't take a conventional system

    The soil evaluation decides this, and finding out at the point of permitting rather than at the point of land acquisition is expensive. If you're buying lots to develop, get the soils looked at before you close on the parcel, not after.

Permit validity: plan for the difference

 South CarolinaGeorgia
Permit valid5 years12 months
Decision windowDriven by evaluation scheduling20 days from complete application
Final inspectionTier 3 may self-inspectCounty, mandatory, before backfill

That five-year versus twelve-month difference is the single most useful thing on this page if you're phasing lots. A South Carolina permit survives a slow market. A Georgia permit does not.

Tank sizing, so your plans match the system

Both states: 1,000 gallons minimum for up to four bedrooms, plus 250 gallons per bedroom above four. Georgia additionally requires two-compartment tanks with the first at least two thirds of liquid capacity, an approved outlet filter, minimum 24-hour retention, and 50 percent additional capacity where a garbage grinder is installed. That last one catches builders who spec disposals as standard.

Also plan for the repair area: South Carolina requires at least 50 percent of the original system size held in reserve. On a tight lot, that reserve is often what decides whether the plan fits.

What we need from you

  • Plat or survey with lot dimensions
  • House plans, or at minimum bedroom count and whether a garbage grinder is specced
  • Intended house position and driveway, so we can site the system without fighting your layout later
  • Well location if there is one, since setbacks are 75 feet private and 100 feet public in South Carolina
  • Your target dates, honestly. We'd rather tell you a date we can hit than one you want to hear

Let's talk before you close on the land

The most valuable call you can make to us is the one before you buy the parcel. SCDES states plainly that not all property is suitable for a septic system. A soil evaluation costs a fraction of what an unbuildable lot costs.

Straight answers

Common questions

How early should we bring you in on a project?
At design, and ideally before you close on the land. The septic permit gates the building permit and the certificate of occupancy, and the soil evaluation determines whether the lot supports a conventional system at all. Both are cheaper to learn early.
Can you handle multiple lots on a phased schedule?
Yes. One point of contact, permits handled per lot, and scheduling built around your build sequence. Volume pricing applies on multi-lot work.
Does Tier 3 self-inspection really save time?
On South Carolina jobs, yes. Tier 3 installers may self-inspect their own installations, which removes a third-party inspector from your critical path. Georgia does not permit this, so on Georgia jobs the county inspection before backfill is a hard dependency we schedule around.
What happens if a lot won't support a conventional system?
An engineered design usually will, and in South Carolina only Tier 3 installers may install Standard 610 systems. It costs more, but on a lot you'd otherwise write off, it's the difference between a buildable parcel and a loss.
Do you work on both sides of the river?
Yes. We hold Tier 3 in South Carolina and Georgia certification, so projects in Aiken and Edgefield counties and projects in Richmond, Columbia, McDuffie and Burke counties are the same sub.
Get started

Get a real estimate, not a guess

Tell us about the property and what it's doing. We'll come look, tell you straight what it needs, and give you a number you can plan around.

  • 📞
    Call or text
    (803) 2-PUMP-IT803-278-6748
  • 🕐
    Office hours
    Mon-Fri, 8am-5pmEmergency service available outside these hours
  • 📍
    Based in
    North Augusta, SCServing the CSRA, both sides of the river

Request an estimate

Most requests get a call back the same business day.

📞 Call Now💬 Text Us